Pool Removal
There are three ways to get rid of your swimming pool.
702 DEMO is your one-stop shop for your pool removal. We take care of everything from draining the pool to getting the permit to replacing the access wall.
Option 1
Complete Pool Removal
This method gives you the opportunity to use your backyard to build a structure, add on to your home, or build a new pool.
Option 2
Pool Fill-In
We punch a large hole in the bottom for drainage and take the top 18 to 24 inches of the pool walls down. The pool fill-in is the most popular choice.
Option 3
Pool Fill-In (Dirt Only)
In this method, we simply fill the pool with dirt. This method leaves the pool shell and deck intact.
Complete Pool Removal Includes:
- All required permits
- Disconnecting the electricity, capping off plumbing lines, and removing the pool equipment
- Completely removing all deck and pool shell
- Backfilling with dirt and compacting in 12-inch lifts
After compaction, the yard will be rough graded so that it is flat and even. Depending on the size of your pool, our experienced crews will have your project done in 2 to 4 days. This method gives you the opportunity to use your backyard to build a structure, add on to your home, or build a new pool.
Our Pool Fill-In Includes:
- All required permits
- Disconnecting the electricity, capping off plumbing lines, and removing the pool equipment
- Hammering a large hole in the bottom of the pool for drainage
- Placing the deck and the top 18 to 24 inches of the pool walls into the pool
- Backfilling with dirt and compacting in 12-inch lifts
This method is the most popular choice. After compaction, the yard will be rough graded so that it is flat and even. Depending on the size of your pool, our experienced crews will have your project done in 2 to 3 days. Filling in your pool will allow you to landscape your yard any way you would like. There will be at least 18 inches of dirt above the buried pool shell, which allows room for irrigation systems and for trees and bushes to be planted.
Our Pool Fill-In (Dirt Only) Includes:
- All required permits
- Hammering a large hole in the bottom of the pool
- Disconnecting the electricity, capping off plumbing lines, and removing the pool equipment
- Backfilling with dirt and compacting in 12-inch lifts
Depending on the size of your pool, our experienced crews will have your project done in 1 to 2 days.
Some jobs are a breeze and others can be full of obstacles for 702 DEMO. It all depends on access for equipment. If we can easily maneuver a small tractor into a backyard, the job is a breeze. The small machine can then break apart the coping, tear down the top 18-24” of the sidewalls and use an attached jackhammer to create drainage holes in the bottom of the pool. The depression is then filled with dirt.
But if the backyard is too tight of a squeeze, the work has to be done by hand, meaning much more time to employ a manual jackhammer and wheelbarrows to cart in the fill dirt. It can become labor-intensive in some cases. We are available to take your call and give you a quote regarding your pool demolition or any other needs 7 days a week. Thank you for considering 702 DEMO.